Improvement of Maintenance Workshops, Engineering Laboratories, and Inventory Management, Mechanical and Electrical Department (MED) , Ministry of Water Resources and Irrigation, Egypt (2010-2014). Assessment of Options for Public Private Partnership in Operation and Maintenance of Irrigation and Drainage Infrastructure in Egypt (With Emphasis on Pumping Stations), Ministry of Water Resources and Irrigation, Mechanical and Electrical Department, Funded by PPIAF, The World Bank (2007-2009). |
Conducting Field Survey for Inventory and Exploratory Investigation of Irrigation Facilities in Ibrahimia Canal (Middle Egypt), NTC International Co. (Ltd.) JICA (Japan International cooperation Agency) World Trade Center, Cairo, Egypt Under cooperation of Irrigation Sector (MWRI, Egypt), (2016-2017).
Conducting Field Survey for Inventory and Exploratory Investigation of Irrigation Facilities in in Kased Canal (Middle Delta), NTC International Co. (Ltd.) JICA (Japan International cooperation Agency) World Trade Center, Cairo, Egypt Under cooperation of Irrigation Sector (MWRI, Egypt), (2017). |
|
Institutional Reform of Egyptian Ministry of Water Resources and Irrigation, Human Resources Management of Regional Water Management Organizations, Funded by GTZ (Germany) (2007-2008). |
Institutional Reform of Egyptian Ministry of Water Resources and Irrigation, Monitoring and Evaluation of Institutional Reform of Ministry of Water Resources and Irrigation in Egypt, Funded by GTZ (Germany) (2007-2009).
|
|
Institutional Reform of Egyptian Ministry of Water Resources and Irrigation, Geo-Referenced Mapping Of Established Water Users’ Organizations And Related Institutional Reform Projects , Funded by GTZ (Germany) (2006-2007). |
Ministry of Water Resources and Irrigation, Monitoring and Evaluation of EPADP Private Sector Participation Pilot Program for Drainage Maintenance, The Egyptian Public Authority for Drainage Projects, Funded by KFW Germany, in Cooperation with ARCADIS EUROCONSULT (2008-2009). |